公共施設等総合管理計画における試算条件に関する考察:−愛知県日進市の事例−  [in Japanese] A STUDY OF TRAIL CALCULATION CONDITION OF COMPREHENSIVE MANAGEMENT PLAN OF PUBLIC FACILITIES AND INFRASTRUCTURES:– A case study in Nisshin city, Aichi pref. –  [in Japanese]

Access this Article

Search this Article

Author(s)

Abstract

This report is a summary of creating a “Comprehensive Management Plan for Public Facilities and Infrastructure” in Nisshin City, Aichi Prefecture. The difference in results obtained through trial calculation conditions based on the prospects for available resources and for medium and long term expenses were compared and analyzed. The analysis showed that results differed greatly depending on the trial calculation conditions. Items necessary to prepare a feasible “Comprehensive Management Plan for Public Facilities and Infrastructure” in the future are conditioned.

This report is a summary of creating a “Comprehensive Management Plan for Public Facilities and Infrastructure” in Nisshin City, Aichi Prefecture. The difference in results obtained through trial calculation conditions based on the prospects for available resources and for medium and long term expenses were compared and analyzed. The analysis showed that results differed greatly depending on the trial calculation conditions. Items necessary to prepare a feasible “Comprehensive Management Plan for Public Facilities and Infrastructure” in the future are conditioned.

Journal

  • AIJ Journal of Technology and Design

    AIJ Journal of Technology and Design 24(56), 403-407, 2018

    Architectural Institute of Japan

Codes

  • NII Article ID (NAID)
    130006386899
  • NII NACSIS-CAT ID (NCID)
    AN10531441
  • Text Lang
    JPN
  • ISSN
    1341-9463
  • NDL Article ID
    028847266
  • NDL Call No.
    Z16-B375
  • Data Source
    NDL  J-STAGE 
Page Top