A rapid solution for the maximum loading point of a power system

抄録

<jats:title>Abstract</jats:title><jats:p>This paper presents a new solution method for computing the maximum loading point of a bulk power system under the condition where the loads of the nodes can be parameterized by a scalar which is the loading level of the system.</jats:p><jats:p>A special loading model, in which the loading level of the system depends on the voltage magnitude of a loading node, is adopted for the purpose of releasing the load‐flow computation from the ill‐condition near and at the maximum loading point. The loading level of the system is unknown in the aforementioned loading model. The maximum loading point is obtained by adjusting the operating parameter so as to achieve the maximum loading.</jats:p><jats:p>The operating parameter is adjusted in the converging process of the Newton‐Raphson iterative computation. The adjustment is computed based on the least squares estimation using the data set which is obtained from its own iteration process.</jats:p><jats:p>It is shown in numerical examples that the proposed method is satisfactorily rapid, stable, and accurate.</jats:p>

収録刊行物

被引用文献 (1)*注記

もっと見る

参考文献 (7)*注記

もっと見る

詳細情報 詳細情報について

問題の指摘

ページトップへ