New methods for optimal operations scheduling and planning of power systems 電力系統における最適運用計画の新手法
Access this Article
Search this Article
Author
Bibliographic Information
- Title
-
New methods for optimal operations scheduling and planning of power systems
- Other Title
-
電力系統における最適運用計画の新手法
- Author
-
陳, 洛南
- Author(Another name)
-
チェン, ルンナン
- University
-
東北大学
- Types of degree
-
工学博士
- Grant ID
-
甲第4408号
- Degree year
-
1991-03-28
Note and Description
博士論文
Table of Contents
- Contents / p2 (0006.jp2)
- 1 INTRODUCTION / p1 (0016.jp2)
- 1.1 A Historical Survey / p1 (0016.jp2)
- 1.2 The Role of Optimization and Computational Mathematics in Power Systems Engineering / p4 (0019.jp2)
- 1.3 Purpose and Outline of the Thesis / p5 (0020.jp2)
- 2 OPERATION SCHEDULING PROBLEMS AND THE APPLIED OPTIMIZA-TION TECHNIQUES / p7 (0022.jp2)
- 2.1 Introduction / p7 (0022.jp2)
- 2.2 Economic Dispatch Problem / p8 (0023.jp2)
- 2.3 Optimal Power Flow / p11 (0026.jp2)
- 2.4 Unit Commitment / p13 (0028.jp2)
- 2.5 Maintenance Scheduling / p16 (0031.jp2)
- 2.6 Conclusions / p21 (0036.jp2)
- 3 RELIABILITY EVALUATION OF POWER SYSTEM WITH NETWORK CON-STRAINTS CONSIDERED / p22 (0037.jp2)
- 3.1 Introduction / p22 (0037.jp2)
- 3.2 New Reliability Indices and Concepts / p24 (0039.jp2)
- 3.3 Reliability Evaluation Based on Deterministic Methods / p31 (0046.jp2)
- 3.4 Reliability Evaluation Based on Probability Methods / p67 (0082.jp2)
- 3.5 Conclusions / p74 (0089.jp2)
- 4 APPLICATIONS OF MATHEMATICAL PROGRAMMING TO ECONOMIC OPERATION PROBLEMS / p75 (0090.jp2)
- 4.1 Introduction / p75 (0090.jp2)
- 4.2 Economic Dispatch with Network Constraints Considered / p76 (0091.jp2)
- 4.3 Global Optimization for Optimal Power Flow Problems / p84 (0099.jp2)
- 4.4 Efficient Methods for Unit Commitment Problem / p93 (0108.jp2)
- 4.5 Pricing Structure Design for Future Power Systems / p115 (0130.jp2)
- 4.6 Conclusions / p131 (0146.jp2)
- 5 OPTIMAL MAINTENANCE SCHEDULING BASED ON TWO-LEVEL HIERARCHICAL MODEL TECHNIQUE / p132 (0147.jp2)
- 5.1 Introduction / p132 (0147.jp2)
- 5.2 Optimization of Isolated System Generators Maintenance Scheduling―"Maintenance Energy"Method― / p133 (0148.jp2)
- 5.3 Optimal Multi-Area System Generators Maintenance Scheduling―"Virtual Load" Method― / p137 (0152.jp2)
- 5.4 Optimal Transmission Lines Maintenance Scheduling―Application of"Cou-pled Method"― / p155 (0170.jp2)
- 5.5 Generators Maintenance Scheduling on the Basis of LOLP Index / p162 (0177.jp2)
- 5.6 Conclusions / p187 (0202.jp2)
- 6 CONCLUSIONS / p188 (0203.jp2)
- 6.1 Summary / p188 (0203.jp2)
- 6.2 Future Work / p189 (0204.jp2)
- REFERENCES / p190 (0205.jp2)
- A DETECTION METHOD FOR UNIQUE OPTIMAL SOLUTION OF LP / p198 (0213.jp2)
- B THRESHOLD SET AND CLASSIFICATION / p201 (0216.jp2)
- C EQUIVALENT LOAD DURATION CURVE AND LOLP,LOEP / p203 (0218.jp2)
- D STREMEL'S DEFINITION OF EFFECTIVE LOAD CARRYING CAPACITY / p206 (0221.jp2)
- E MONOTONIC INCREASE CHARACTERISTIC OF INCREMENTAL LOLP WITH RESPECT TO MAINTENANCE CAPACITY / p208 (0223.jp2)
- PUBLICATIONS / p210 (0225.jp2)