Decomposition methods for complex factory scheduling problems
著者
書誌事項
Decomposition methods for complex factory scheduling problems
Kluwer Academic Publishers, c1997
大学図書館所蔵 全19件
  青森
  岩手
  宮城
  秋田
  山形
  福島
  茨城
  栃木
  群馬
  埼玉
  千葉
  東京
  神奈川
  新潟
  富山
  石川
  福井
  山梨
  長野
  岐阜
  静岡
  愛知
  三重
  滋賀
  京都
  大阪
  兵庫
  奈良
  和歌山
  鳥取
  島根
  岡山
  広島
  山口
  徳島
  香川
  愛媛
  高知
  福岡
  佐賀
  長崎
  熊本
  大分
  宮崎
  鹿児島
  沖縄
  韓国
  中国
  タイ
  イギリス
  ドイツ
  スイス
  フランス
  ベルギー
  オランダ
  スウェーデン
  ノルウェー
  アメリカ
注記
Includes bibliographical references and index
内容説明・目次
内容説明
The factory scheduling problem, that of allocating machines to competing jobs in manufacturing facilities to optimize or at least improve system performance, is encountered in many different manufacturing environments. Given the competitive pressures faced by many companies in today's rapidly changing global markets, improved factory scheduling should contribute to a flrm's success. However, even though an extensive body of research on scheduling models has been in existence for at least the last three decades, most of the techniques currently in use in industry are relatively simplistic, and have not made use of this body of knowledge. In this book we describe a systematic, long-term research effort aimed at developing effective scheduling algorithms for complex manufacturing facilities. We focus on a speciflc industrial context, that of semiconductor manufacturing, and try to combine knowledge of the physical production system with the methods and results of scheduling research to develop effective approximate solution procedures for these problems. The class of methods we suggest, decomposition methods, constitute a broad family of heuristic approaches to large, NP-hard scheduling problems which can be applied in other environments in addition to those studied in this book.
目次
Preface. 1. Introduction. 2. Industrial Context and Motivation for Decomposition Methods. 3. Review of Decomposition Methods for Factory Scheduling Problems. 4. Modelling Interactions Between Subproblems: The Disjunctive Graph Representation and Extensions. 5. Workcenter-Based Decomposition Procedures for the Classical Job Shop Environment. 6. A Generic Decomposition Procedure for Semiconductor Testing Facilities. 7. Time-Based Decomposition Procedures for Single-Machine Subproblems with Sequence-Dependent Setup Times. 8. Time-Based Decomposition Procedures for Parallel Machine Subproblems with Sequence-Dependent Setup Times. 9. Naive Rolling Horizon Procedures for Job Shop Scheduling. 10. Tailored Decomposition Procedures for Semiconductor Testing Facilities. 11. Computational Results for Job Shops with Single and Parallel Machine Workcenters. 12. The Effects of Subproblem Solution Procedures and Control Structures. 13. Conclusions and Future Directions. Author Index.
「Nielsen BookData」 より