CCGT plant components : development and reliability
Author(s)
Bibliographic Information
CCGT plant components : development and reliability
(I Mech E seminar, 1999-1)
Professional Engineering Publishing for the Institution of Mechanical Engineers, 1999
Available at / 2 libraries
-
No Libraries matched.
- Remove all filters.
Note
"Papers presented at a one-day seminar CCGT-5 Combined Cycle Gas Turbine Plant Components - Development and Reliability held on 23 October 1998 at IMechE headquarters, London, UK."--P. facing t.p.
Includes bibliographical references and index
Description and Table of Contents
Description
The over-capacity of Combined Cycle Gas Turbine plant on the competitive international system and the related characteristics makes reliability a prime concern. The papers in this volume describe the experience obtained on components of CCGT plant, other than the main turbines.
Table of Contents
- Operating requirements of generating plants - a transmission system operator perspective, M. Bray
- advanced design CCGTs - asset or liability?, N. Orchard
- reliability and durability from large HRSGS, R. Anderson and M. Pearson
- colling towers for CCGT, A. Streng
- turbine air intake treatment, L. Cuvelier
- gas turbine compressor washing - review and state-of-the-art technology, J.-P. Stalder
- considerations for alternative configurations for large heavy-duty industrial combined cycle plant, M. Jarvis and T. Raddings
- gas turbine blade assessent, J.D. Wilson, J.E Frackrell, et al.
by "Nielsen BookData"