AUA guidelines for backfilling and contact grouting of tunnels and shafts
Author(s)
Bibliographic Information
AUA guidelines for backfilling and contact grouting of tunnels and shafts
ASCE Press, 2003
Available at / 2 libraries
-
No Libraries matched.
- Remove all filters.
Note
Includes bibliographical references and indexes
Description and Table of Contents
Description
These guidelines focus on the grouting performed to fill the voids between the excavated surface and the tunnel and shaft linings. This comprehensive new book will help those in the underground construction industry to increase their understanding of grouting terms and methods. It will also help improve the quality of contract documents, relating to both backfill and contact grouting and the in-place grout, and reduce costs and schedule time. In addition, following these guidelines will help ensure that engineers in the industry avoid practices that could lead to potential claims.
Table of Contents
Introduction
Affects of geological conditions of grouting
Structural and operations requirements of the completed facility
Grouting of various lining types
Grout materials
Grout properties
Backfill grouting
Contact grouting
Grouting equipment
Record keeping
Quality control
Contract documents
by "Nielsen BookData"